When purchasing a new home, clients often inherit outdated spaces that are either dysfunctional or simply unappealing. Such was the case for a couple who came to me with a cramped primary bathroom. Defined by an unmistakable 1980s aesthetic and a truly perplexing layout, the space was divided into a maze of enclosed areas, including a walled-in shower and an awkward corner vanity.
By fully gutting the room, we were able to reimagine it from the ground up, creating a space that feels open, expansive, and inviting. With the partition walls removed, natural light now flows freely throughout. The design direction, guided by the clients, centers on calm and serenity. A restrained palette of pale marble and sky-blue accent tiles—laid in a herringbone pattern at the vanity and echoed in the generous shower—creates a quiet sense of rhythm and ease.
There is nothing to distract, nothing to disrupt—just a soothing space to begin the day or unwind in the evening.
And for contrast, here is what it looked like before...
If you have a dated bathroom longing for an update, give me a call. I can help!
Happy designing!
Showing posts with label remodel. Show all posts
Showing posts with label remodel. Show all posts
Monday, June 1, 2026
Monday, September 23, 2024
Nature-Inspired Great Room by Fiorito Interior Design
This gorgeous, nature--inspired Great Room--comprised of the kitchen, dining area, and sitting room—was reimagined for some wonderful repeat clients, beginning with a small, treasured piece of art.
Their large 1950s ranch house nestled into a gentle hill surrounded by orchards of fragrant orange, lemon, and cherry trees initially featured a too-small kitchen adjacent to a warren of small spaces with low ceilings serving as a dining and sitting area. They dreamed of a more spacious, light-filled layout.
A complete redesign of the home not only resolved spatial constraints but also embraced the beauty of the home’s natural surroundings. By removing walls and creating an open-plan layout, we enhanced the flow and connectivity between the kitchen, dining, and sitting areas, seamlessly integrating the outdoors with the indoors.
The relocated kitchen now faces the backyard, to facilitate outdoor entertaining and features a large island, serving as a welcoming focal point for both cooking and socializing. I designed a distinctive ceiling feature above the island, crafted from planks of the adjacent vaulted ceiling, mirroring the shape of the island below. This feature adds architectural interest and visually connects the flat kitchen plane with the vaulted plank ceiling of the sitting area, creating a harmonious sense of continuity and warmth.
A beautiful, prized painting of a bird on a branch created the direction for the color and texture palette. An intriguing yellow-green-tan background in the art guided my choices for the backsplash tile (an iridescent version mimics light glinting on water) and countertops. The kitchen's soothing color palette features various shades of natural green, while the dining area introduces feather-blue tones through chair upholstery and rug. Just steps away, the inviting sitting area features a rebuilt fireplace clad in cut, polished Haisa marble tiles in a vertical pattern. The soft, generous seating creates a comfortable spot for movie nights or cozying up by the fire on a cold winter evening. The elegant, simple silhouettes of the furniture enhance the serene and calming atmosphere of the space.
After photos: Bernardo Grijalva and Fiorito Interior Design
Happy designing!
Their large 1950s ranch house nestled into a gentle hill surrounded by orchards of fragrant orange, lemon, and cherry trees initially featured a too-small kitchen adjacent to a warren of small spaces with low ceilings serving as a dining and sitting area. They dreamed of a more spacious, light-filled layout.
A complete redesign of the home not only resolved spatial constraints but also embraced the beauty of the home’s natural surroundings. By removing walls and creating an open-plan layout, we enhanced the flow and connectivity between the kitchen, dining, and sitting areas, seamlessly integrating the outdoors with the indoors.
The relocated kitchen now faces the backyard, to facilitate outdoor entertaining and features a large island, serving as a welcoming focal point for both cooking and socializing. I designed a distinctive ceiling feature above the island, crafted from planks of the adjacent vaulted ceiling, mirroring the shape of the island below. This feature adds architectural interest and visually connects the flat kitchen plane with the vaulted plank ceiling of the sitting area, creating a harmonious sense of continuity and warmth.
A beautiful, prized painting of a bird on a branch created the direction for the color and texture palette. An intriguing yellow-green-tan background in the art guided my choices for the backsplash tile (an iridescent version mimics light glinting on water) and countertops. The kitchen's soothing color palette features various shades of natural green, while the dining area introduces feather-blue tones through chair upholstery and rug. Just steps away, the inviting sitting area features a rebuilt fireplace clad in cut, polished Haisa marble tiles in a vertical pattern. The soft, generous seating creates a comfortable spot for movie nights or cozying up by the fire on a cold winter evening. The elegant, simple silhouettes of the furniture enhance the serene and calming atmosphere of the space.
After photos: Bernardo Grijalva and Fiorito Interior Design
Happy designing!
Monday, October 14, 2019
"A Walk In The Forest" Bathroom by Fiorito Interior Design
When a husband and wife team of professional botanists wanted to remodel their cramped, 1980s-era bathroom, we naturally looked to the forest for inspiration! With the expert help of Elite Construction Services Inc., we opened up this formerly segmented space (the toilet and washer/dryer were in a separate area from the shower/tub and vanity) to make it feel larger. A controlled, muted color scheme further enlarges the room by connecting all the planes, and serves as a neutral backdrop for a calming spa experience.
All the materials speak to my clients’ love of nature. The custom wood vanity with tower and coordinating mirror frame are made so the grain lays in a refreshing horizontal pattern. The porcelain field tile is made to look like limestone with shadows of sediment and fossils. Other elements add to the feeling of a walk in the woods: long-format porcelain tiles of falling leaves cascade down a wall and blend into a stream of river stones that roll across the width of the space. The open, curbless shower with a hidden linear drain invites users for a cleansing respite. Sleek, modern fixtures and a wall-hung toilet enhance the clean, soothing look of this organic, tranquil bathroom.
All photos by Genia Barnes.
If you'd like to infuse a bit of nature into your bathroom, contact me by clicking on my logo to the right! I'd love to create something with you.
Happy designing!
All the materials speak to my clients’ love of nature. The custom wood vanity with tower and coordinating mirror frame are made so the grain lays in a refreshing horizontal pattern. The porcelain field tile is made to look like limestone with shadows of sediment and fossils. Other elements add to the feeling of a walk in the woods: long-format porcelain tiles of falling leaves cascade down a wall and blend into a stream of river stones that roll across the width of the space. The open, curbless shower with a hidden linear drain invites users for a cleansing respite. Sleek, modern fixtures and a wall-hung toilet enhance the clean, soothing look of this organic, tranquil bathroom.
All photos by Genia Barnes.
If you'd like to infuse a bit of nature into your bathroom, contact me by clicking on my logo to the right! I'd love to create something with you.
Happy designing!
Labels:
A Walk In The Forest,
bathroom,
contemporary,
custom,
Fiorito Interior Design,
frameless shower enclosure,
Jeff Fiorito,
leaves,
linear drain,
minimal,
modern,
organic,
pebble floor,
remodel,
shower,
tile,
vanity
Monday, December 10, 2018
After Demo, Then What?
If you've never had a remodel or renovation in your home, the steps can be a little vague. Often I find it valuable to let clients know what they can expect in terms of work and, consequentially, how long it all takes.
Let's start with a simple remodel of a space. Nearly all of my projects consist of "going down to the studs" as it is called in the industry. This step is referred to as "demo," as in demolition...it is when all the elements of your old space are removed and demolished, often in a delightful flurry of sledge hammers and crow bars, to create a blank slate and make way for your new space! However, if I am dealing with new construction, that leads to the same result: the studs.
And this is where we start this phase of the journey. Studs are what make up the framing of a room. A residential room is typically framed with 2" x 4" or 2" x 6" pieces of wood spaced 16" apart, on their center lines. These pieces of wood are the studs.
Below is a photo of a master bathroom suite I designed. The 2" x 4" framing you see is outlining what will become a new bathroom and master closet.
But here is where things can get a little vague. Mostly of my clients know that the next step is for the walls to go up and then they assume it is done. But there are many time consuming steps in between, performed by skilled, master craftsmen, to achieve walls that are ready to be painted.
The first step is to put up the drywall. This is generally a gypsum board product in a sheet form with paper on the back and front. They typically come in 4' widths with a length ranging between 8' and 16'. The drywall is affixed--normally in a horizontal orientation--to the wood studs and held in place with drywall screws.
Once this is done, the next step is to apply drywall compound (a thick, plaster-y substance sometimes called joint compound or, euphemistically, "mud") to all joints (where two pieces of drywall come together) and over the heads of the drywall screws. Sometimes this is done by a different team. I have seen drywall installers come to affix the drywall only and then pass these next steps to plasterers.
Then over all the joints comes a material called drywall tape. This joint tape gets embedded into the joint compound itself using a trowel blade so the finish is smooth.
This is left to dry for 24 hours.
A 2nd coat of mud is applied on all taped joints and this is left to dry for yet another 24 hours!
Next comes a sanding to knock down all uneven spots or areas where there might be some excess mud. It should look something like the photo below.
The 3rd and final coat of joint compound is often called a skim coat. A smooth skim coat is almost universally desired but it is possible at this point to do what is called a "knockdown" coat which consists of giving the mud a texture. There are many textures with many names. You may have heard people talk about a "popcorn" ceiling, a kind of ceiling finish (usually containing asbestos!) that was popular in the 70s and 80s with a very bumpy surface resembling a layer of popcorn or millions of tiny stalactites. That is an extreme example (it was generally sprayed on instead of applying by a trowel), but there is also "orange peel" texture, a wall version of the popcorn ceiling. And one of the more subtle textures is called a skip trowel texture. While there will still be a few low peaks here and there, it is not as offensive as orange peel or popcorn. But in this day and age, a smooth finish is what everyone agrees looks best.
After the skim coat is applied it must--you guessed it--dry for another 24 hours. You can see how this process takes time and patience. Once a client sees the steps necessary, they have a newfound respect for their home!
To prepare the walls for painting, they are given a final sanding, and are then wiped down with a sponge to remove all the loose dust. Now the wall is ready for a drywall primer. Why a drywall primer? Haven't we reached the end of what could possibly be put on the walls? Well, the drywall primer is made of a PVA or shellac/alcohol-based primer and is applied to seal the porous drywall and joint compound. When you or your painter comes to apply paint, whether latex or water-based, the drywall primer will prevent the paint from soaking into your drywall and joint compound.
It's quite a process...one that surprises those unfamiliar with construction. But your home is important. Think of it as protecting the integrity of your investment as well as enriching the quality of your life within it.
Happy designing!
Let's start with a simple remodel of a space. Nearly all of my projects consist of "going down to the studs" as it is called in the industry. This step is referred to as "demo," as in demolition...it is when all the elements of your old space are removed and demolished, often in a delightful flurry of sledge hammers and crow bars, to create a blank slate and make way for your new space! However, if I am dealing with new construction, that leads to the same result: the studs.
And this is where we start this phase of the journey. Studs are what make up the framing of a room. A residential room is typically framed with 2" x 4" or 2" x 6" pieces of wood spaced 16" apart, on their center lines. These pieces of wood are the studs.
Below is a photo of a master bathroom suite I designed. The 2" x 4" framing you see is outlining what will become a new bathroom and master closet.
But here is where things can get a little vague. Mostly of my clients know that the next step is for the walls to go up and then they assume it is done. But there are many time consuming steps in between, performed by skilled, master craftsmen, to achieve walls that are ready to be painted.
The first step is to put up the drywall. This is generally a gypsum board product in a sheet form with paper on the back and front. They typically come in 4' widths with a length ranging between 8' and 16'. The drywall is affixed--normally in a horizontal orientation--to the wood studs and held in place with drywall screws.
Once this is done, the next step is to apply drywall compound (a thick, plaster-y substance sometimes called joint compound or, euphemistically, "mud") to all joints (where two pieces of drywall come together) and over the heads of the drywall screws. Sometimes this is done by a different team. I have seen drywall installers come to affix the drywall only and then pass these next steps to plasterers.
Then over all the joints comes a material called drywall tape. This joint tape gets embedded into the joint compound itself using a trowel blade so the finish is smooth.
This is left to dry for 24 hours.
A 2nd coat of mud is applied on all taped joints and this is left to dry for yet another 24 hours!
Next comes a sanding to knock down all uneven spots or areas where there might be some excess mud. It should look something like the photo below.
![]() |
| Steven Puetzer/Photographer's Choice/Getty Images |
The 3rd and final coat of joint compound is often called a skim coat. A smooth skim coat is almost universally desired but it is possible at this point to do what is called a "knockdown" coat which consists of giving the mud a texture. There are many textures with many names. You may have heard people talk about a "popcorn" ceiling, a kind of ceiling finish (usually containing asbestos!) that was popular in the 70s and 80s with a very bumpy surface resembling a layer of popcorn or millions of tiny stalactites. That is an extreme example (it was generally sprayed on instead of applying by a trowel), but there is also "orange peel" texture, a wall version of the popcorn ceiling. And one of the more subtle textures is called a skip trowel texture. While there will still be a few low peaks here and there, it is not as offensive as orange peel or popcorn. But in this day and age, a smooth finish is what everyone agrees looks best.
After the skim coat is applied it must--you guessed it--dry for another 24 hours. You can see how this process takes time and patience. Once a client sees the steps necessary, they have a newfound respect for their home!
To prepare the walls for painting, they are given a final sanding, and are then wiped down with a sponge to remove all the loose dust. Now the wall is ready for a drywall primer. Why a drywall primer? Haven't we reached the end of what could possibly be put on the walls? Well, the drywall primer is made of a PVA or shellac/alcohol-based primer and is applied to seal the porous drywall and joint compound. When you or your painter comes to apply paint, whether latex or water-based, the drywall primer will prevent the paint from soaking into your drywall and joint compound.
It's quite a process...one that surprises those unfamiliar with construction. But your home is important. Think of it as protecting the integrity of your investment as well as enriching the quality of your life within it.
Happy designing!
Monday, November 12, 2018
A Sleek "Marble" Bathroom by Fiorito Interior Design
Originally built in the 1980s with terra cotta tile and cheap, polished brass, this bathroom (previously seen in this sneak peek) is now a sleek, modern marvel. The juxtaposition of simplicity and luxury is evidenced by the walls clad in a large-format porcelain tile that looks like marble but requires no sealing or maintenance and is easy to clean. Gleaming modern plumbing fixtures also present restraint but with a touch of glamour. The eleven-foot wide vanity with integrated toe kick light is capped by a single-piece framed mirror that coordinates with the furniture below it. A dynamic, graphic light fixture presides over this improved space and mirrors the diagonal herringbone floor.
All AFTER photos: Bernardo Grijalva
And for contrast, here are some BEFORE images...
If you have been thinking about a bathroom remodel but haven't yet, give me a call.
Happy designing!
All AFTER photos: Bernardo Grijalva
And for contrast, here are some BEFORE images...
If you have been thinking about a bathroom remodel but haven't yet, give me a call.
Happy designing!
Labels:
bath tub,
bathroom,
chandelier,
contemporary,
Fiorito Interior Design,
interior design,
Jeff Fiorito,
master bathroom,
minimal,
modern,
remodel,
shower,
tile,
tub,
vanity
Subscribe to:
Posts (Atom)



































